Skip to content
SoleForge

005 — OEM / ODM Manufacturing Process

How SoleForge turns your brief into shipped footwear

Every order follows the same disciplined workflow — from the first inquiry through development, sampling, bulk production, quality control and shipping. Below is exactly what happens at each stage, with the lead times and terms you can plan around.

The workflow

Six stages, one accountable partner

Each stage produces a defined output that feeds the next — so nothing is lost in handoffs and reorders stay consistent.

  1. 01

    Inquiry & tech pack

    Output: quotation + development plan

    Send us a brief, tech pack, sketch, target price or reference pair. We review feasibility, recommend constructions and materials, and return a quotation — typically within one business day.

  2. 02

    Development & sampling

    Lead time: 7–12 days

    Our pattern, last and mold team builds your first physical sample. We document the BOM, construction and tolerances so the style is repeatable from day one.

  3. 03

    Sample confirmation

    Output: confirmed reference sample

    You evaluate fit, materials, color, branding and finish. We iterate as needed and lock an approved confirmation sample that becomes the production reference standard.

  4. 04

    Bulk production

    Lead time: 30–45 days after sample approval

    On deposit and confirmed sample, we schedule the line, secure materials and run bulk under the documented specification — keeping construction and quality consistent across the run.

  5. 05

    Quality control & testing

    Standards: ISO 9001 · AQL · third-party labs

    Incoming material checks, inline inspection during assembly and a pre-shipment AQL inspection, with SGS / ITS lab testing for bonding, abrasion, slip resistance and chemical compliance on request.

  6. 06

    Packing & shipping

    Terms: FOB Ningbo / Shanghai, EXW, CIF, or DDP

    We prepare cartons, labeling, barcodes and export documentation to your specification, then ship on the agreed terms and share tracking through to delivery.

Supply terms

Plan with real numbers

No surprises. These are the standard terms we work to — confirmed precisely in your quotation for your specific style and quantity.

Minimum order quantity
500 pairs / style / color
Sample lead time
7–12 days
Bulk lead time
30–45 days after sample approval
Payment terms
30% deposit, 70% before shipment (T/T, L/C)
Shipping terms
FOB Ningbo / Shanghai, EXW, CIF, or DDP

Quality assurance

Quality is engineered in at every gate

We do not rely on a single final check. Quality is controlled from incoming materials through final cartons, against a confirmed reference sample and a documented bill of materials.

Our systems are built around ISO 9001, our facilities are bsci audited, and we provide SGS / ITS testing reports plus REACH compliant compliance on request.

  • Incoming material inspection

    Leather, textiles, soles, foams and chemicals checked against spec before production starts.

  • Inline process control

    Cutting, stitching, lasting and bonding monitored during assembly to catch issues early.

  • Pre-shipment AQL inspection

    Statistical sampling on appearance, construction, sizing and packaging before release.

  • Third-party lab testing

    SGS / ITS testing for bond strength, abrasion, slip resistance and chemical compliance on request.

FAQ

Process questions, answered

Founded in 2009, we have run this workflow across 300+ brands worldwide. Here is what buyers ask most.

What do I need to send to start development?+

A tech pack is ideal, but it is not required. A sketch, a target price, a reference pair, or even a clear description of the construction and use case is enough for us to assess feasibility and quote. The more detail you provide on materials, sizing and quantities, the more precise the first sample.

What is the minimum order quantity and how long do orders take?+

Our standard MOQ is 500 pairs / style / color. Sampling typically takes 7–12 days, and bulk production runs 30–45 days after sample approval. Exact timing depends on construction, materials availability and tooling status, all of which we confirm in your quotation.

What are your payment and shipping terms?+

Standard payment is 30% deposit, 70% before shipment (T/T, L/C). For shipping we support FOB Ningbo / Shanghai, EXW, CIF, or DDP, so you can choose the incoterm that fits your logistics and customs setup.

How do you ensure quality across a large production run?+

Quality is built in, not inspected in at the end. We start from a confirmed reference sample and a documented BOM, run incoming material checks and inline inspection during assembly, and finish with a pre-shipment AQL inspection. SGS / ITS lab testing is available for performance and compliance verification.

Can I order samples before committing to bulk production?+

Yes — and we recommend it. A confirmed sample lets you verify fit, materials, branding and finish before you commit to a bulk quantity. Sample development and confirmation is a standard, expected step in every OEM/ODM project. See our sample development service for details.

Ready to develop your footwear line?

Send us your tech pack, target price, or a reference pair. We'll come back with a quote and a development plan within one business day.